Hi, welcome to visit !

Get a Quote

  1. home
  2. Equipment Cement Description

Equipment Cement Description

Dec 19, 2015nbsp018332The cement is pumped after dropping the bottom plug, and then the cement is followed by the top plug. When the bottom plug reaches its seat at the float collar, its diaphragm is ruptured Pressure increase at the surface is an indication of plug landing and the cement flows through the plug down to the casing shoe, up into the annulus.

Get a QuoteOnline Message

  • 40-Year Qualified Brand

    Founded in the 1970s, it has a history of more than 40 years.

  • 350,000 Ping Workshop

    covering an area of 350,000 square meters

  • 160 Countries

    production and sales in more than 160 countries

OUR ADDRESS